Upgrade of Fire Fighting systems in Ras Sedr Crude Oil Exporting Port and the Industrial Area

Upgrade of Fire Fighting systems in Ras Sedr Crude Oil Exporting Port and the Industrial Area

IN Projects
Investor Name:
GENERAL PETROLEIM COMPANY (GPC)
Published Date:
July 27, 2019
Location:
Egypt
Value:
1,650,000 $
Architecture:
About Project

SCOPE OF PROJECT

Design , Supply, manufacture, installation of Fire water tank 2000 m3 ,
including all mechanical, civil, cathodic protection, earthing, painting ,
and testing according to API 650 code.

  • Design, Supply and installation of firefighting pumps, including pump Room building and
    piping work for the suction and discharges lines.
  • Supply, manufacture, installation and welding of the pipe lines inside the
    station and the Tie-ins between the existing pump house and the new one,
    and between the
  • Design, Supply and install of the new HDPE pipe line 110 mm and Tie-in with Existing and new CS lines.
  • Design Supply and install of all firefighting equipment’s ( fire cabinet, fire hydrant ,foam
    trailer and sprinklers).